Tel: 01293 863 074     Fax: 01293 863 343     Email: info@fastfixscaffolding.com
DESIGN
The change in the scaffold regulations from BS5973 to the new European regulation EN12811 means that all scaffolding structures should be erected in accordance with a pre-designed drawing. In light of this Fast Fix invested heavily in a bespoke CAD programme and employed a full time CAD technician to produce scaffolding layout drawings.

Prior to erection of any scaffold structure, a site survey is carried out to ascertain the proximity of other buildings, manhole locations and anything else that may affect the scaffold design. Further to the survey, the technician then designs the scaffold and produces a set of working drawings. From the design a 'picking list' of the required components is produced which alleviates the need for surplus material handling and storage on site.

The scaffold itself is relatively easy to design due to its' modular nature. The loading capacities for each individual bay size have all been pre-determined by the manufacturer, therefore once a layout has been produced, the design becomes a fully calculated scaffold structure. If required, due to the height or need to add debris netting or monaflex sheeting to a facade, tying patterns can be quickly overlaid and the relevant calculations produced.


© 2008 Fast Fix Scaffolding. All rights reserved. Web Design by WebCreation UK